Skip to main content

Engineering

The Engineering Department reviews and approves all proposed construction plans pertaining to new water and wastewater connections, as well as tenant improvements and lateral repairs. Engineering is responsible to inspect all construction for compliance with GHID’s Standard Plans and Specifications. Engineering also provides Blue Stakes to protect GHID’s utilities and maintain records of the water and wastewater systems. Contact us at (801) 968-3551 or plans@ghid.org.

Join our mailing list