Skip to main content

18B: 4100 South Waterline Replacement - Bangerter Highway to 5600 West

Consultant (Design): Horrocks Engineers (WVC/UDOT - Local Governments Project)

Consultant (CM): PEC (Project Engineering Consultants)

Contractor: Geneva Rock Products, Inc.

Status: The Contractor is beginning to install the loops on the 16 and 20-inch transmission line in preparation for storm drain laterals to be installed. This work will take place in the middle of the road over the winter. 

Logo of the Drinking Water State Revolving Fund

 *This Project is partially funded by a Drinking Water State Revolving Fund Program through the Environmental Protection Agency and the Utah Department of Environmental Quality. Visit www.epa.gov/dwsrf for more information.