Skip to main content

Inspection Requirements

  1. Developer/Contractor must give Granger-Hunter Improvement District (The District) a minimum of 24 hour's notice prior to all inspections. When scheduling inspections please note the following:
    • The District's inspection hours are from 7:30 A.M. to 4:00 P.M., Monday - Thursday, excluding holidays
    • Inspections shall be scheduled by calling the District’s office at 801.968.3551.
    • No inspections will be scheduled from voice mail messages. If necessary please leave a message to call you back.
    • Additional inspection fees may be assessed if a District representative is dispatched, and the job is not inspection ready. Please give as much notice as possible for cancellations.
  2. All work completed that has not been inspected will be required to be uncovered and inspected prior to any final acceptance given for the project. Please not that:
    • Projects that have not been given a final acceptance letter will not be allowed to connect to the District’s water and sewer Utilities, and/or,
    • Projects that are connected to the District’s Utilities will be considered to be in default, and the connection will be terminated until final acceptance is given.
  3. In the event a stop work order is issued, the Developer/Contractor shall stop work and comply with all requirements set forth by the District’s inspectors

 NOTE: It is the contractor’s sole responsibility to comply with all State of Utah, Salt Lake County, West Valley City, and GHID requirements and specifications.

Inspection Requirements